Along the edge of the seat, I used some long thin rounded tiles to hide the flat edge of the marble. These took some effort hold in place until they set.
After this I had to stop and wait for the plumbing. We originally planned to hire a plumber, but a friend a work had some plumbing experience and wanted to teach me to braze copper. With some practice work and a little supervision we managed to get it right with no leaks! The valve handles and tub spout will connect to this hardware in the wall.
The next step was replacing the backer board over the plumbing. By the way...the little black kitty in the window is Inka. We adopted him last year a couple of months after we lost Jasper.
And then of course more tiling...
And for the last picture we have all the tile on the walls!
In the next post I'll show the results after grouting (much darker!) and the start on the floor tiling.